  • DFDS: cold store mobile signal lets scanners work inside the freezers

    DFDS-branded refrigerated lorries at the Simonswood cold store, Liverpool
    SectorLogistics and cold storage
    BuildingCold store with three freezer chambers plus production and packing areas, 11,000 m²
    LocationSimonswood, Liverpool
    NetworksEE, Vodafone
    SolutionNextivity CEL-FI QUATRA EVO: 1 network unit, 6 coverage units, 2 LPDA donor antennas and 16 internal omni antennas on a distributed antenna system (DAS)
    TimescaleCompleted August 2026; three weeks on site, in a single visit; the client confirmed the works were completed to schedule
    SignalNo signal → Strong (-85 dBm)

    Signal is measured in dBm: the closer to zero, the stronger. Above -92 dBm is strong; below -115 dBm is very weak.

    The challenge

    At DFDS's Simonswood cold store in Liverpool, poor cold store mobile signal meant warehouse staff couldn't use their EE and Vodafone handheld scanners inside the three freezer chambers, so stock couldn't be tracked at the shelf. A site survey found the freezers were dead zones throughout, with no usable signal. At -20 to -25 °C, dense racking, narrow aisles and concrete dividing walls blocked signal, and solid walls did the same in the production areas of the 11,000 m² site.

    The solution

    UCtel surveyed the site and cable routes, then installed a Nextivity CEL-FI QUATRA EVO distributed antenna system. One network unit drives six coverage units: three for the freezers and three for production and packing, feeding 16 internal antennas. Two roof donor antennas were aligned to the best EE and Vodafone cells. The freezer coverage units sit in IP65 enclosures in rooftop pods, with sealed roof penetrations to minimise work in the cold zones.

    Dense racking in a freezer aisle: coverage had to reach every shelf
    Dense racking in a freezer aisle: coverage had to reach every shelf
    Cable tray across the freezer roofs, keeping work inside the cold zones short
    Cable tray across the freezer roofs, keeping work inside the cold zones short

    The results

    Scanners now have EE and Vodafone coverage inside the freezer chambers, and coverage also reaches the production and packing areas. Freezer signal went from none to strong (around -85 dBm), with good EE 800 MHz data speeds even away from the antennas. The work was completed in August 2026, to schedule, in three weeks on site, and no issues have been reported since.

    Have a similar building?