• Report a signal problem
  • Neko Health: clinic mobile signal so phones work below ground

    CEL-FI GO G43 in the basement plant room at Neko Health Park Modern, boosting all four networks
    SectorHealthcare (private clinics)
    BuildingHealth clinic on the ground floor and two basement levels of a high-end residential building
    LocationBayswater, London
    NetworksEE, Vodafone, O2, Three
    SolutionNextivity CEL-FI GO G43 (one unit covering all four networks, as Vodafone and Three were merged at the site) with two donor panel antennas and a distributed antenna system (DAS) of 13 internal antennas: 8 on Basement 2, 3 on Basement 1 and 2 on the ground floor
    TimescaleCompleted July 2026; antenna cabling installed in stages during the fit-out, then the booster installed and commissioned over two days
    SignalNo signal → Fair (-94.5 dBm)

    Signal is measured in dBm: the closer to zero, the stronger. Above -92 dBm is strong; below -115 dBm is very weak.

    The challenge

    With little or no clinic mobile signal, staff and clients at Neko Health's Park Modern clinic couldn't rely on their phones. The clinic occupies the ground floor and two basement levels of a residential building on Bayswater Road. UCtel's surveys in 2022 and May 2026 found no usable signal inside. The upper floors are private residences, so there was no roof access. The work also had to fit around the fit-out: ceilings about to close, air-conditioning ducts in the way, and no slab drilling before 09:00.

    The solution

    With the landlord's approval, UCtel clamped two donor panel antennas to existing steelwork at ground level at the back of the building, where outdoor signal was good. Cabling went in early, before the ceilings closed, using existing fire-stopped penetrations where possible. Thirteen internal antennas cover the clinic: eight on Basement 2, three on Basement 1 and two on the ground floor. Because Vodafone and Three are merged at this site, a single CEL-FI GO G43 in the plant room boosts EE, O2 and the combined Vodafone and Three network together. It was commissioned in two days on temporary power.

    Two donor antennas (circled) clamped to existing steelwork at the back of Park Modern
    Two donor antennas (circled) clamped to existing steelwork at the back of Park Modern

    The results

    Phones now work throughout the clinic, with fair to strong 4G signal on all four networks on every floor (an average of -94.5 dBm in the TapSurv as-built survey in August 2026). Once permanent power was connected, the fit-out contractor's project lead confirmed everything was working as it should, with mobile signal throughout the space, and thanked UCtel for a great install. No issues have been reported since.